The specific case.
Cell, temperature, operating profile and warranty conditions. We identify the information available and the assumptions the study needs.
The Kyklios degradation model
The manufacturer's curve is a reasonable reference for a generic use. Our study relates the battery to your operation, your site and the conditions of your contract.
See where it applies
From conditions to decision
We use the degradation model in our engineering studies. The question is not only how much capacity the battery loses, but what that trajectory means for the size of the system, its warranty and the capacity additions.
Cell, temperature, operating profile and warranty conditions. We identify the information available and the assumptions the study needs.
We relate calendar ageing to the ageing associated with cycling. The uncertainty is explained alongside the results.
A technical reading of the result, its assumptions and its limits, to be checked against the needs of the project.
The model, in motion
A synthetic example to see the mechanism. Move the cycles, the depth of discharge and the temperature: the trajectory moves and the guaranteed schedule stays where it is.
Drag the dispatch. The guaranteed curve does not move.
| Year | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 |
|---|---|---|---|---|---|---|---|---|---|---|
| Guaranteed | 90.5 | 86.6 | 83.6 | 81.0 | 78.8 | 76.8 | 74.9 | 73.2 | 71.6 | 70.0 |
| P90 | 92.8 | 89.0 | 85.8 | 82.8 | 80.1 | 77.5 | 75.0 | 72.6 | 70.3 | 68.0 |
| Margin P90 | +2.3 | +2.4 | +2.2 | +1.8 | +1.3 | +0.7 | +0.1 | -0.6 | -1.3 | -2.0 |
This is the outcome that matters and the one nobody prices in: the same battery, under the same guaranteed schedule, clears it or breaches it depending on how you dispatch it. The curve the manufacturer gave you assumed a profile. Yours is in your revenue model, and the two were never compared. That is why a verdict without a scenario is worth nothing, and why we will not hand you one.
Synthetic example, illustrative shapes only, not the calibrated model. A 10 MW / 40 MWh system, LFP 314 Ah cell, annual schedule to year 20. A real study models your cell, your site and your contract.
A report that can be checked
The model is calibrated on public laboratory data. When the manufacturer or the client provides their own data, the study uses it as an anchor and says so.
The same inputs give the same result. No black box and no model that quietly changes.
Every coefficient carries a citation. A parameter with no traceable source does not enter the calculation.
Results are delivered as P50 and P90 trajectories. Where the margin is narrower than the band, we say so.
Model version, a hash of every input and output, and the origin of every figure. A reviewer verifies it with sha256 and the manifest, with no access to us.
Specific assignments
These assignments can be contracted separately. The scope is agreed according to the information available and the decision ahead of you.
We study the capacity the project needs, how it evolves under the planned use and when it may require an addition. The result provides a technical basis for comparing configurations.
Propose a studyWe review what is guaranteed, how it is measured and which conditions can void coverage. We check the planned operation against the technical schedules and the responsibilities.
Review a warrantyWe review the condition of the battery, the warranty that remains and the pending capacity additions. The information available determines what we can conclude and what needs verifying.
Ask about an assetAlso with other teams
An independent reading of the product and its datasheet, oriented to the project's questions.
We study the degradation curve of a specific case against a flat rate. Its integration into other tools is assessed case by case.
We can provide the battery study within your report. Scope, responsibility and deliverable are agreed before we start.
Scope of the model
The result corresponds to the cell, the operation and the conditions declared. If they change, the study has to be reviewed. The limits of the information must accompany the conclusion.
The model studies degradation. It does not produce a plant availability forecast. Contractual obligations require their own review.
We do not sell a self-service application. We deliver engineering studies supported by the model. The report is not a certification and does not replace the independent engineer a bank appoints.
The next step
A project, a warranty or training for your team. Tell us what you need to resolve. The first conversation is free of charge.
Let's talk